Production

News

27.07.2015

HMS Neftemash will supply fuel gas treatment module for “Gazprom Neft” project

Being incorporated by HMS Group, “HMS Neftemash”, JSC and “Gazprom Neft Novy Port”, Ltd. (Yamalo-Nenets Autonomous District) have negotiated a contract for elaboration of design documentation, fabrication and procurement of skid-modular process equipment.

Following the Contract under implementation of project for construction of comprehensive gas treatment unit at Novoportovskoe oil and gas condensate field, a prefabricated fuel gas treatment module will be supplied at the field.

The gas treatment module consists of two isolated modules (process section and control section) being fully equipped with required engineering systems. All electrical equipment and electrical lighting is ex-proof; location of the process unit inside of a heated module guarantees reliable equipment operation under severe climatic environment of the Far North.

Design capacity of the comprehensive gas treatment unit will make 7 bln. m3/year; its commissioning will enable Gazprom Neft to utilize up to 95% of associated petroleum gas at Novoportovskoe oil and gas condensate field.


“HMS Neftemash”, JSC has been working at oil and gas field equipment market for over 50 years now. Long standing experience of cooperation with the largest oil and gas recovery companies proves trust in quality of produced equipment being a consequence of competitive supply terms. 

 “HMS Neftemash” press service


Back to the list